I–15 Interchange and SR–77 Improvements

I–15 Interchange and SR–77 Improvements

  • Springville, Utah (Region 3)
  • IQF (Independent Quality Firm)
  • New SPUI Interchange on I–15
  • Two New Overpass Structures
  • Widened SR–77 from Two Lanes to Five Lanes into Springville
  • Reviewed of All Aspects of Design and Construction Work
  • Improved the Drainage and Irrigation System Along SR–77

300 West Riverdale

300 West Riverdale

  • Riverdale, Utah (Region 1)
  • Widened 300 West from Two Lanes to Four Lanes with a Landscaped Island from Washington Terrace to Riverdale Road
  • Improved Business and Private Access
  • Improved Water, Sewer, and Storm Drain Utilities to Facilitate Future Demands

6200 South and I–215

6200 South and I–215

  • Cottonwood Heights, Utah (Region 2)
  • Road Design, Construction Management and Survey
  • Roadway Design to Add Capacity to Interchange and Turn Lane Storage
  • Design, Construction Management, and Survey
  • Accelerated Design and Construction Schedule to Take Advantage of Federal Incentive Money (ARRA)
  • 6200 South – 2700 West to 4000 West Taylorsville, Utah (Region 2)
  • Widened 6200 South from Three Lanes to Five Lanes
  • Provided Improved Access to UDOT Property at 3385 West
  • Improved Drainage Throughout the Corridor and Neighboring Subdivisions
  • Added Landscaping and Sidewalks to Both Sides of the Corridor
  • Acquired Necessary ROW from Adjacent Parcels

4700 South I–215 Interchange Improvements

4700 South I–215 Interchange Improvements

  • Taylorsville, Utah (Region 2)
  • Widened 4700 South to Facilitate Turn Lanes on 2200 West for Salt Lake Community College Access
  • Widened 2200 West to Add Turn Lanes and Shoulder to Salt Lake Community College Entrance
  • Added a Lane to the Southbound Off-ramp to Prevent Stacking on I–215
  • Improved Drainage on 2200 West
  • Acquired Necessary ROW from Adjacent Parcels